Start with level land
The full building footprint should be level and ready before installers arrive.
Clear access and obstructions
Move vehicles, materials, fences and debris; trim low branches and provide safe crew access.
Confirm utilities and permits
Complete utility-locate requirements and verify local permits or approvals before the scheduled installation.
Engineering, warranty, permitting and installation requirements can vary by project. Final written order documents and applicable local requirements control.